Why load is removed in the process of strengthening?

In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.

structural reinforcement carbon fiber


There is a general problem of structural reinforcement: the stress of the newly added part will lag slightly. In order to make the new and old structure to bear force together, should first remove the original structure load before the reinforcement. It is a better way to reapply it after reinforcement.


How do you remove the load?

1.Complete and accurate unloading can be used reverse loading unloading jack; 

2.Simple unloading can be removed only live load, and avoid the construction load.


Produtos Recomendados da Horse Construction

Você pode encontrar tudo o que precisa aqui. Confie e experimente esses produtos, você vai perceber uma grande diferença depois.

Fibra de carbono unidirecional HM-20

A fibra de carbono da Horse Construction é para reforço estrutural, reparo e modernização de substratos de concreto, alvenaria, aço e madeira em edifícios, pontes, rodovias, ferrovias, túneis, píeres e aeroportos civis.

Mais >

Laminado de fibra de carbono unidirecional HM-1.2T

O laminado de polímero reforçado com fibra de carbono Horse (CFRP) é um laminado composto pré-curado, colado na estrutura como reforço externo com epóxi HM-120CP.

Mais >

Sistema de laminado de fibra de carbono protendido

O sistema de laminado CFRP protendido Horse (sistema CFRP pós-tensionado) inclui dispositivos de ancoragem e laminado de fibra de carbono especialmente projetados para pontes, edifícios e reforço de estruturas de aço.

Mais >

Back
Top
Close